Malaysia Ultra-Trail MY50 (Malaysia) 2027
Also known as: Malaysia by UTMB
Starting and finishing in Taiping, it runs from the Lake Gardens via Burmese Pool over Speedy Hill, with views of the town and the Strait of Malacca, then through durian and palm plantations and a pre-war railway tunnel on a runnable course redesigned in 2025.
The course tops out at 321 m (low point 16 m). The main climb comes right from the start: 301 m around 0–8 km. About 60% of the distance is gentle (under 5% grade), so there is a lot of running. In 2025, 88% of starters finished. The median finish was about 13 h.
Predict your finish from your ITRA index
Enter your ITRA performance index to get your finish time, aid-station splits and cutoff margins from the results of 60 finishers of this race — the same model as the TRAIL STATUS app. Nothing is saved or sent.
The app adds predictions from your training log (Strava), race-day pacing and more. Free, no sign-up.
Predict in detail from my Strava trainingOverview
- Date
- Sat, 4 Sep 2027
- Start
- 05:00
- Location
- Malaysia
- Distance
- 54.5 km
- Elevation gain
- 1,977 m
- Time limit
- 17h
- ITRA
- 50K
- Official website
- malaysia.utmb.world/races/MY50
Elevation profile
Aid stations and cutoffs
| # | Distance | Aid station | Segment | Cutoff |
|---|---|---|---|---|
| 1 | 9.7 km | Tiger Temple | 9.7 km | — |
| 2 | 17.4 km | Spritzer EcoPark | 7.7 km | — |
| 3 | 23.2 km | KTM Tunnel | 5.8 km | — |
| 4 | 35.6 km | Changkat Ibol | 12.4 km | Day 1 15:0010h |
| 5 | 39.8 km | U-turn Kuning Sari | 4.2 km | — |
| 6 | 42.3 km | Peak 300 | 2.5 km | — |
| F | 54.5 km | FINISH | 12.2 km | Day 1 22:0017h |
The small figure under each cutoff is the time from the start. Day 1 is the day of the start.
2025 results
794 starters, 697 finishers (87.8% finish rate). Finish times of those who finished:
- Fastest
- 4h 57m
- Top 10%
- 9h 7m
- Top 25%
- 10h 46m
- Median
- 12h 44m
- Top 75%
- 14h 32m
- Top 90%
- 15h 32m
- Last finisher
- 16h 53m
"Top 25%" means one in four finishers had crossed the line by this time.
Years with a different course or different cutoffs are not directly comparable.
Other races
- Malaysia Ultra-Trail MY100 (Malaysia) 2026Sat, 12 Sep 2026 · Malaysia · 97.7 km
- Malaysia Ultra-Trail MY100 (Malaysia) 2027Sat, 4 Sep 2027 · Malaysia · 97.7 km
- Malaysia Ultra-Trail MY50 (Malaysia) 2026Sat, 12 Sep 2026 · Malaysia · 54.5 km
- Malaysia Ultra-Trail MY25 (Malaysia) 2026Sat, 12 Sep 2026 · Malaysia · 25.9 km
- Malaysia Ultra-Trail MY25 (Malaysia) 2027Sat, 4 Sep 2027 · Malaysia · 25.9 km
- The Most Beautiful Thing TMBT 109K (Sabah, Malaysia) 2027Sat, 11 Sep 2027 · Malaysia · 108 km
From your training log, TRAIL STATUS estimates your finish time, aid-station splits and cutoff margins for this race.
Predict my raceCompiled from each race's official information. Details can change, so always check the race's official website for the latest. Spotted a mistake? Please tell us through the contact form.
TRAIL STATUS · FAQ · Privacy policy